Front of a two-storey house with its roof torn open on one side, a Hodge excavator reaching in with a demolition grab and roof timbers piled in front
From our drone footage

House demolition in Kent and London

We take down houses and bungalows and leave the site level.

Call us 01322 22 66 48

Get a quote

Tell us the job. We call you back.

The first part, such as SE15, is fine.
What it is, its size and the access.

We use your details to reply to this request. Privacy and cookies

What we take down

Houses and bungalows

The roof comes off first, then the walls, with water to keep the dust down.

  • Asbestos survey before work starts, as the law requires
  • Section 80 notice sent to the council
  • Gas, electricity and water cut off before we start
  • Site left level and clear

Garages, sheds and outbuildings

Smaller buildings are often quicker. A building of 1,750 cubic feet (about 50 cubic metres) or less does not need a Section 80 notice.

  • Detached garages and sheds
  • Outbuildings and workshops
  • Rubble taken away with waste transfer notes

What happens after you call

  1. You call or send the form

    Tell us what the building is and where it is. A postcode is enough to start.

  2. We visit and quote

    We look at access, the neighbours' walls and what is inside, then quote in writing.

  3. The paperwork

    An asbestos survey of the building, the Section 80 notice to the council (up to 6 weeks), and a party wall notice if a shared wall is involved. We tell you which ones you need.

  4. A written plan

    The law requires the demolition to be planned in writing before it starts. We write it and keep to it.

  5. Taking it down

    Roof first, then walls, with the excavator and water to keep the dust down.

  6. Leaving it ready

    Rubble removed or crushed and the ground levelled, ready for your builder.

Watch a job from start to finish

Drone footage of one of our residential demolition jobs, from start to finish.

The roof comes off with a demolition grab, then the walls, and the site is cleared and levelled.

Residential demolition, in our project log

Site clearance and crushing after a demolition

What clients say

We contacted HDL to quote and then assist us with our first development. Not only were HDL easy to deal with, but they also highlighted and prevented problems we had not foreseen during the first phase of the project.

Mr and Mrs GencelPrivate developers

BWA has had the pleasure in working with Hodge Demolition on several demolition and soft strip out projects since 2016. We were greatly impressed with their communication skills, workmanship, and commitment to maintaining a safe working environment for all.

J PhilipsAssociate, BWA Limited

Questions before you start

The guide explains the rules on council notices, asbestos surveys and waste.

Read the guide

Do I need planning permission to demolish my house?

Outside conservation areas, demolishing a house is usually permitted development, so it does not need full planning permission. You must first ask the council whether it wants to approve the method of demolition and how the site will be left. The council has 28 days to decide. Pubs, theatres and live music venues always need full permission.

Source: GPDO 2015, Schedule 2, Part 11

Do I need to tell the council before demolishing?

Usually, yes. Before most demolitions the council's building control team must get a notice under Section 80 of the Building Act 1984. Work can start when the council replies, or after 6 weeks. Small buildings of 1,750 cubic feet (about 50 cubic metres) or less are exempt, and so is internal work in a building that stays in use. Planning permission does not replace the notice.

Source: Building Act 1984, section 80

What if the building is in a conservation area or listed?

In a conservation area most demolition needs planning permission, and demolishing without it is a criminal offence. A listed building needs listed building consent before any part of it is demolished. Check with the council planning team before you book any work.

Source: Town and Country Planning Act 1990, section 196D

Will my neighbours be told?

Yes. The occupiers of the buildings next door get a copy of the Section 80 notice. If the work exposes a wall you share with a neighbour, or digs near their foundations, you also need to give them a party wall notice, usually 2 months before the work.

Source: GOV.UK: party walls and building work

Who disconnects the gas, electricity and water?

Every supply must be cut off before work starts. The gas and electricity suppliers get a copy of the Section 80 notice, and the council can require the gas, electricity and water to be disconnected through the suppliers.

Source: Building Act 1984, section 82

Does the building need an asbestos survey first?

Yes. The law requires asbestos to be checked before any demolition, and removed before the main works begin. For most buildings that means a refurbishment and demolition survey, which opens up walls, floors and ceilings to find asbestos hidden in the structure. It applies to houses as well as commercial buildings.

Source: Control of Asbestos Regulations 2012, regulation 5

Rear of a Hodge excavator on a cleared plot of tracked earth, with site containers, a skip and a truck beyond

Tell us about your site

Call us or send four details. We visit the site, then quote in writing.